Skip to main content

Two minutes · Your inputs · Directional labor-cost scenario

What could the traceable part of execution drag be costing this team?

Execution drag has two interacting sources: friction in the work path and reduced access to skill in the people carrying it. This calculator does not diagnose either source. It converts the directly traceable extra time you enter, such as chasing, repeated review, avoidable meetings, rework, and context rebuilding, into a loaded-labor scenario. Elapsed delay, missed value, and capacity effects stay outside the number unless separate evidence supports them. Three inputs produce a directional planning scenario, not a measured result.

Built for the COO, CFO, Chief of Staff, and the operators who own stuck priorities.

The scenario

Estimate direct extra labor on one team

No email required. The result uses only your inputs. Change an assumption and the scenario changes with it.

Three inputs

Count the people whose output is judgment, analysis, or decisions. Not total headcount.


Use the loaded figure your finance team uses. If none is available, enter a documented planning estimate that includes pay, benefits, payroll taxes, and overhead.

Count only time reasonably attributable to chasing, repeated review, avoidable meetings, rework, or context rebuilding. Exclude elapsed waiting, productive work, and speculative missed value.

46 min

 

Use a number you can defend. The starting value is a planning scenario, not a benchmark. Move the slider to the amount this team can reasonably reconstruct from actual work.
Calculation assumptions (adjust if yours differ)


The directional estimate

Annual loaded cost of the extra time entered $0 Sensitivity band: $0 to $0
Team extra time per working day 0  
Loaded cost of extra time per working day $0
Loaded cost per hour $0
 
What this does and does not count. Included: only the extra time entered above, valued at loaded labor cost. Excluded: elapsed delay, client-supplied opportunity value, and any effect on judgment, focus, communication, creativity, retention, or work quality unless separately evidenced. This is a planning scenario, not a measured outcome or forecast of cash savings.

The calculator estimates a direct-labor scenario. It cannot locate the pattern or test the capacity effect.
The Stalled Priority Snapshot reconstructs one live work path and tests whether the evidence supports a credible local routing hypothesis: 90 minutes, a one-page readout within 24 hours, and one 14-day routing experiment. $1,500 flat.

Book a Stalled Priority Snapshot Or start with the Work Demand Diagnostic

Snapshot: local routing hypothesis. Diagnostic: shared pattern. Pilot: reversibility.
The Snapshot fee credits toward the Diagnostic if booked within 30 days. On-site available in the NY/NJ metro.

The number is the start, not the finding.

The calculator estimates the loaded cost of directly traceable extra time. The Snapshot tests one local work path. The Diagnostic examines whether the pattern is shared. The Pilot tests whether changing the conditions improves an agreed operating metric. Each stage earns, redirects, or stops the next.

Book a Stalled Priority Snapshot

Founder-led engagements. Snapshot: 90 minutes, $1,500, credits toward the Diagnostic.